Lachlan’s Line – Macquarie Park

Design and construction of high quality urban redevelopment subdivision.

  • Earthworks
  • Retaining walls
  • Pavements and footpaths
  • Services: Electrical, water, sewer, telecommunications
  • Drainage
  • Landscaping
  • RMS and Council road works
  • Wicks Rd and Waterloo Rd intersection upgrade

Darling Park Stage III Excavation

Excavation and shoring works for Darling Park Stage III at Darling Harbour.

  • Sheet pile and timber shoring for the boundary and lift pits
  • Bulk excavation and site remediation including removal of contaminated material
  • Preparation of base for the lift core
  • Concrete ground beams and pile caps

Darling Park Stage 2

Design and construct shoring systems, excavation, foundations and tunneling for a major office building at Darling Harbour.

  • Design and construct shoring systems
  • Excavation and foundations
  • Tunneling for major office building and civic precincts
  • 10,000 tonnes of contaminated waste treated in accordance with the RAP
  • Total excavation approximately 60,000m³

Central Park Block 4S

Secant wall construction and bulk excavation for Central Park Block 4S at Chippendale.

  • Installation of continuous flight auger piles to construct a secant wall
  • Bulk excavation and disposal of material
  • Installation of anchors and struts to provide stability to the secant wall

Central Station Stormwater Harvesting Tank

Early works and construction of stormwater harvesting tank beneath Central Station Sydney.

  • Concrete encasement of existing wrought iron columns
  • Bracing and underpinning of columns and Central Station structure
  • Bulk excavation and diversion of existing stormwater
  • Formwork, reinforcing and pouring of a concrete retention tank with a 100,000L capacity

IKEA Tempe

Civil works for the new IKEA store at Tempe including site remediation and all external works.

  • Bulk earthworks and site remediation of contaminated landfill
  • Stormwater reticulation and detention/treatment systems
  • On-grade carpark of 60,000m² with all signage
  • Landfill gas cut-off wall and venting systems
  • Bellevue Street realignment and reconstruction
  • Main site entry signalised intersection with the Princes Highway

Darling Walk

Primary civil contractor for the public precinct works at the Darling Walk Development.

  • All bulk and detailed earthworks
  • Construction of underground stormwater detention tank to Greenstar Standards
  • All concrete slabs in the exterior section
  • Architecturally designed children’s playground
  • Unique structures including a giant slide and interactive waterworks
  • Construction of new slip lane, intersection and traffic signals

Central Park Block 8

Secant wall construction and bulk excavation for Central Park Block 8 at Chippendale.

  • Installation of continuous flight auger piles to construct a secant wall
  • Bulk excavation and disposal of material
  • Installation of whalers and anchors to provide stability to the secant wall

Pacific Square Residential Complex

Excavation and stormwater works for the Pacific Square residential complex at Maroubra.

  • Excavation of 60,000m³ predominantly in sand
  • Demolition of ground slabs and mass concrete pad footings
  • Diversion of main drainage pipeline 1500–1800mm diameter
  • Construction of stormwater pipeline chambers
  • Pipe jacking of 1650mm diameter pipes under Anzac Parade