UNSW Health Translation Hub
Lachlan’s Line – Macquarie Park

Design and construction of high quality urban redevelopment subdivision.
- Earthworks
- Retaining walls
- Pavements and footpaths
- Services: Electrical, water, sewer, telecommunications
- Drainage
- Landscaping
- RMS and Council road works
- Wicks Rd and Waterloo Rd intersection upgrade
Darling Park Stage III Excavation

Excavation and shoring works for Darling Park Stage III at Darling Harbour.
- Sheet pile and timber shoring for the boundary and lift pits
- Bulk excavation and site remediation including removal of contaminated material
- Preparation of base for the lift core
- Concrete ground beams and pile caps
Darling Park Stage 2

Design and construct shoring systems, excavation, foundations and tunneling for a major office building at Darling Harbour.
- Design and construct shoring systems
- Excavation and foundations
- Tunneling for major office building and civic precincts
- 10,000 tonnes of contaminated waste treated in accordance with the RAP
- Total excavation approximately 60,000m³
Central Park Block 4S

Secant wall construction and bulk excavation for Central Park Block 4S at Chippendale.
- Installation of continuous flight auger piles to construct a secant wall
- Bulk excavation and disposal of material
- Installation of anchors and struts to provide stability to the secant wall
Central Station Stormwater Harvesting Tank

Early works and construction of stormwater harvesting tank beneath Central Station Sydney.
- Concrete encasement of existing wrought iron columns
- Bracing and underpinning of columns and Central Station structure
- Bulk excavation and diversion of existing stormwater
- Formwork, reinforcing and pouring of a concrete retention tank with a 100,000L capacity
IKEA Tempe

Civil works for the new IKEA store at Tempe including site remediation and all external works.
- Bulk earthworks and site remediation of contaminated landfill
- Stormwater reticulation and detention/treatment systems
- On-grade carpark of 60,000m² with all signage
- Landfill gas cut-off wall and venting systems
- Bellevue Street realignment and reconstruction
- Main site entry signalised intersection with the Princes Highway
Darling Walk

Primary civil contractor for the public precinct works at the Darling Walk Development.
- All bulk and detailed earthworks
- Construction of underground stormwater detention tank to Greenstar Standards
- All concrete slabs in the exterior section
- Architecturally designed children’s playground
- Unique structures including a giant slide and interactive waterworks
- Construction of new slip lane, intersection and traffic signals
Central Park Block 8

Secant wall construction and bulk excavation for Central Park Block 8 at Chippendale.
- Installation of continuous flight auger piles to construct a secant wall
- Bulk excavation and disposal of material
- Installation of whalers and anchors to provide stability to the secant wall
Pacific Square Residential Complex

Excavation and stormwater works for the Pacific Square residential complex at Maroubra.
- Excavation of 60,000m³ predominantly in sand
- Demolition of ground slabs and mass concrete pad footings
- Diversion of main drainage pipeline 1500–1800mm diameter
- Construction of stormwater pipeline chambers
- Pipe jacking of 1650mm diameter pipes under Anzac Parade