Central Station Stormwater Harvesting Tank

Early works and construction of stormwater harvesting tank beneath Central Station Sydney.

  • Concrete encasement of existing wrought iron columns
  • Bracing and underpinning of columns and Central Station structure
  • Bulk excavation and diversion of existing stormwater
  • Formwork, reinforcing and pouring of a concrete retention tank with a 100,000L capacity

Green Square Pedestrian Tunnel

Extension of existing pedestrian tunnel into the basement of a new building to provide direct access to Green Square Station.

  • Demolition, shoring, excavation and remediation
  • Piling and waterproofing
  • Formwork, reinforcement and concrete pours
  • Public domain works
  • Roadworks

Orica Salt Slab

Design and construction of a post-tensioned concrete containment slab at Botany.

  • Earthworks and retaining walls
  • Detention basin
  • 9,500m² post-tensioned ground slab
  • Capping layer

Orora Water Treatment Plant

Three-component civil and structural works for a new water treatment plant within an active paper mill.

  • Upgrade of existing dam and pump station including new sheet piled wall, tubular steel piles, installation of pontoon and pump building
  • Civil and structural works for a new water treatment plant including earthworks, structural concrete slabs, retaining walls and tank stands
  • Supply and installation of structural steel building
  • Rejects Area upgrade including concrete slab and walls with radius curve incorporating steel rails

Carlton United Brewery Building Upgrade

Upgrading of the 120-year-old heritage listed Carlton United Brewery Building at Chippendale.

  • Demolition, excavation and substantial upgrade of the structure to accommodate 6 new cooling towers
  • Architectural enclosure for cooling towers
  • Demolition of existing and construction of new fire stair between buildings 22 and 26
  • New structural steel walkway connecting the cooling tower enclosure to a fire egress

Glebe Island Gypsum Terminal

Structural and civil works for a new gypsum terminal at Glebe Island wharf.

  • Hopper foundation bolts installed in existing wharf
  • Retaining walls
  • Weigh station housing and foundations
  • Piling works
  • Main silo foundations and slabs

Frasers Broadway Stage 1.1

Construction of a large detention tank and stormwater trunk line at Abercrombie Street Ultimo.

  • Large detention tank covering 2,000m²
  • 3,000m² secant pile wall to the perimeter with piled columns supporting the roof
  • Main stormwater trunk line constructed at night down Abercrombie Street

Prospect Reservoir Scour Upgrade

Upgrade of the 130-year-old reservoir scour system at Prospect Reservoir.

  • Slip-lining of twin Ø1200mm RCP pipes with Ø1000mm PE lining
  • Construction of new outfall structure
  • Demolition of sections of old pipeline in tunnel
  • Installation of new valve and pipe components
  • New end of line valves and new access shaft
  • Associated hydraulic, electric and telemetry systems

Nepean Dam Environmental Flow

Sole civil contractor for all environmental flow upgrade works at Nepean Dam.

  • Piling foundations
  • Gabion retaining wall construction
  • Additional drainage works and road repair
  • Pressure pipe supply and install
  • Fixed cone dispersion valve supply and install
  • Reinforced concrete outlet structure construction
  • Electrical control systems and actuators