ICC and Darling Square Civil Works

Civil works for the Sydney International Convention Centre and Darling Square precinct.

  • Sewer and water main relocations and connections
  • Stormwater installation up to 1050mm diameter
  • Culvert construction
  • Concrete pavements, footpaths, kerbs and medians
  • Asphalt mill and re-sheet works
  • Traffic signal installations
  • Signage and linemarking

Warragamba Pipeline Urgent Repairs

Underpinning and joint repair to a 1940s above-ground water pipeline at Mulgoa and Kemps Creek.

  • Bored piles and structural concrete footings
  • Structural steel pipe supports and rocker assemblies
  • Renewal of pipe expansion joints

Barangaroo Stormwater

Trenching and installation of new large diameter stormwater infrastructure at Barangaroo.

  • Trenching and installation of new 1800mm diameter stormwater
  • Custom cast in-situ pits
  • Prefabricated pipe bends
  • Concrete to steel pipe connections
  • Traffic staging and controls

Central Station Stormwater Harvesting Tank

Early works and construction of stormwater harvesting tank beneath Central Station Sydney.

  • Concrete encasement of existing wrought iron columns
  • Bracing and underpinning of columns and Central Station structure
  • Bulk excavation and diversion of existing stormwater
  • Formwork, reinforcing and pouring of a concrete retention tank with a 100,000L capacity

Orora Water Treatment Plant

Three-component civil and structural works for a new water treatment plant within an active paper mill.

  • Upgrade of existing dam and pump station including new sheet piled wall, tubular steel piles, installation of pontoon and pump building
  • Civil and structural works for a new water treatment plant including earthworks, structural concrete slabs, retaining walls and tank stands
  • Supply and installation of structural steel building
  • Rejects Area upgrade including concrete slab and walls with radius curve incorporating steel rails

Frasers Broadway Stage 1.1

Construction of a large detention tank and stormwater trunk line at Abercrombie Street Ultimo.

  • Large detention tank covering 2,000m²
  • 3,000m² secant pile wall to the perimeter with piled columns supporting the roof
  • Main stormwater trunk line constructed at night down Abercrombie Street

Prospect Reservoir Scour Upgrade

Upgrade of the 130-year-old reservoir scour system at Prospect Reservoir.

  • Slip-lining of twin Ø1200mm RCP pipes with Ø1000mm PE lining
  • Construction of new outfall structure
  • Demolition of sections of old pipeline in tunnel
  • Installation of new valve and pipe components
  • New end of line valves and new access shaft
  • Associated hydraulic, electric and telemetry systems