Victoria Cross Station
Bank Street Wharf
Fire Abatement Systems Upgrade, Blue Mountains Botanic Gardens
ICC and Darling Square Civil Works

Civil works for the Sydney International Convention Centre and Darling Square precinct.
- Sewer and water main relocations and connections
- Stormwater installation up to 1050mm diameter
- Culvert construction
- Concrete pavements, footpaths, kerbs and medians
- Asphalt mill and re-sheet works
- Traffic signal installations
- Signage and linemarking
Warragamba Pipeline Urgent Repairs

Underpinning and joint repair to a 1940s above-ground water pipeline at Mulgoa and Kemps Creek.
- Bored piles and structural concrete footings
- Structural steel pipe supports and rocker assemblies
- Renewal of pipe expansion joints
Barangaroo Stormwater

Trenching and installation of new large diameter stormwater infrastructure at Barangaroo.
- Trenching and installation of new 1800mm diameter stormwater
- Custom cast in-situ pits
- Prefabricated pipe bends
- Concrete to steel pipe connections
- Traffic staging and controls
Central Station Stormwater Harvesting Tank

Early works and construction of stormwater harvesting tank beneath Central Station Sydney.
- Concrete encasement of existing wrought iron columns
- Bracing and underpinning of columns and Central Station structure
- Bulk excavation and diversion of existing stormwater
- Formwork, reinforcing and pouring of a concrete retention tank with a 100,000L capacity
Orora Water Treatment Plant

Three-component civil and structural works for a new water treatment plant within an active paper mill.
- Upgrade of existing dam and pump station including new sheet piled wall, tubular steel piles, installation of pontoon and pump building
- Civil and structural works for a new water treatment plant including earthworks, structural concrete slabs, retaining walls and tank stands
- Supply and installation of structural steel building
- Rejects Area upgrade including concrete slab and walls with radius curve incorporating steel rails
Frasers Broadway Stage 1.1

Construction of a large detention tank and stormwater trunk line at Abercrombie Street Ultimo.
- Large detention tank covering 2,000m²
- 3,000m² secant pile wall to the perimeter with piled columns supporting the roof
- Main stormwater trunk line constructed at night down Abercrombie Street
Prospect Reservoir Scour Upgrade

Upgrade of the 130-year-old reservoir scour system at Prospect Reservoir.
- Slip-lining of twin Ø1200mm RCP pipes with Ø1000mm PE lining
- Construction of new outfall structure
- Demolition of sections of old pipeline in tunnel
- Installation of new valve and pipe components
- New end of line valves and new access shaft
- Associated hydraulic, electric and telemetry systems