Nepean Dam Environmental Flow

Sole civil contractor for all environmental flow upgrade works at Nepean Dam.

  • Piling foundations
  • Gabion retaining wall construction
  • Additional drainage works and road repair
  • Pressure pipe supply and install
  • Fixed cone dispersion valve supply and install
  • Reinforced concrete outlet structure construction
  • Electrical control systems and actuators

Darling Walk

Primary civil contractor for the public precinct works at the Darling Walk Development.

  • All bulk and detailed earthworks
  • Construction of underground stormwater detention tank to Greenstar Standards
  • All concrete slabs in the exterior section
  • Architecturally designed children’s playground
  • Unique structures including a giant slide and interactive waterworks
  • Construction of new slip lane, intersection and traffic signals

Pacific Square Residential Complex

Excavation and stormwater works for the Pacific Square residential complex at Maroubra.

  • Excavation of 60,000m³ predominantly in sand
  • Demolition of ground slabs and mass concrete pad footings
  • Diversion of main drainage pipeline 1500–1800mm diameter
  • Construction of stormwater pipeline chambers
  • Pipe jacking of 1650mm diameter pipes under Anzac Parade