Nepean Dam Environmental Flow

Sole civil contractor for all environmental flow upgrade works at Nepean Dam.
- Piling foundations
- Gabion retaining wall construction
- Additional drainage works and road repair
- Pressure pipe supply and install
- Fixed cone dispersion valve supply and install
- Reinforced concrete outlet structure construction
- Electrical control systems and actuators
Darling Walk

Primary civil contractor for the public precinct works at the Darling Walk Development.
- All bulk and detailed earthworks
- Construction of underground stormwater detention tank to Greenstar Standards
- All concrete slabs in the exterior section
- Architecturally designed children’s playground
- Unique structures including a giant slide and interactive waterworks
- Construction of new slip lane, intersection and traffic signals
Pacific Square Residential Complex

Excavation and stormwater works for the Pacific Square residential complex at Maroubra.
- Excavation of 60,000m³ predominantly in sand
- Demolition of ground slabs and mass concrete pad footings
- Diversion of main drainage pipeline 1500–1800mm diameter
- Construction of stormwater pipeline chambers
- Pipe jacking of 1650mm diameter pipes under Anzac Parade